Heavy Industrial Area, Tema - Ghana

Refurbishment of the Quality Control Laboratory

Project Information: Purchase order and payment have been made for urgent equipping of the Quality Control Department for critical analysis.

Project Status:
  • Tender document for the refurbishment has been prepared for this project and forwarded to the Managing Director for the way forward.
  • The Laboratory currently cannot conduct a comprehensive/full scale analysis of petroleum products and this situation is affecting our revenue generation negatively.
  • Challenges: Due to the volume of the refurbishment works, steps have been taken by TOR to retrofit the laboratory in the interim.