Project Information: Purchase order and payment have been made for urgent equipping of the Quality Control Department for critical analysis.
Project Status:
Tender document for the refurbishment has been prepared for this project and forwarded to the Managing Director for the way forward.
The Laboratory currently cannot conduct a comprehensive/full scale analysis of petroleum products and this situation is affecting our revenue generation negatively.
Challenges: Due to the volume of the refurbishment works, steps have been taken by TOR to retrofit the laboratory in the interim.